New Projects

New Project


Providing scientific and sustainable solutions for pre-construction phases, including waterproofing system design, BOQ preparation, and technical validation.

Part 1


  • Designing the waterproofing system
  • Preparation of BOQ,method statement, shop drawings
  • Product suggestion and System selection
  • Vendor evaluation and on boarding

Part 2


  • Full time Supervision to ensure quality control
  • Vetting the shop drawings and method statements submitted by vendor.
  • Checking of the products for right consumption and right chemistry.
  • Maintaining the checklist of execution and submission of weekly reports.